Entry IDService NoBefore Application PhotoDuring Application PhotoAfter Application PhotoReporting DateDamage SideApplication AreaDamage NoDamage TypeApplication DateDescriptionReporterWork Code
4043001
25/08/2023LeftK4301-12Assembly25/08/2023

k-43 left assembly process 1-12 completed

Hüseyin ŞahinJ450
3985444
22/07/2023FSAN-B32-DT11DT222/07/2023

Lorem ipsum dolor amet 123

Demir AydemirJ454
39840522/07/2023FPAsia North 4521122/07/2023

Damaged Tower Repair

Ergin PekmezekmekJ480
3609T10-36
18/09/2022T5,T4,T3,T2,T1MIDAT10-36INTERMEDIATE COAT DFT SAMPLE16/09/2022

Dft measurement was taken for thickness confirmation over the topcoat paint damage down to the intermediate layer on MIDA. It has been observed that there is no need for an intermediate coat of paint on these surfaces.

HASAN GREENYURTJ395
3608T10-35
18/09/2022T7MIDCMIDC-T7TOPVOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 3 m wide and 1.5 m in length. Topcoat paintwork was done on the surface at the end of the painting process.

HASAN GREENYURTJ395
3607T10-34
18/09/2022T1MIDBMIDB-T1TOPCAOT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 5 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 5 m width surface.

HASAN GREENYURTJ395
3606T10-33
18/09/2022T2MIDBMIDB-T2TOPCOAT SURFACE16/09/2022

The size of the damage, which is a topcoat surface defect, is 5 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 5 m width surface.

HASAN GREENYURTJ395
3605T10-32
18/09/2022T3MIDBMIDB-T3TOPCOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 5 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 5 m width surface.

HASAN GREENYURTJ395
3604T10-31
18/09/2022T4MIDBMIDB-T4TOPCOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 5 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 5 m width surface.

HASAN GREENYURTJ395
3603T10-30
18/09/2022T5MIDBMIDB-T5TOPCOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 6 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 6 m width surface.

HASAN GREENYURTJ395
3602T10-29
18/09/2022T6MIDBMIDB-T6TOPCOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 6 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 6 m width surface.

HASAN GREENYURTJ395
3601T10-28
18/09/2022T7MIDBMIDB-T7TOPCOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 6 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 6 m width surface.

HASAN GREENYURTJ395
3600T10-27
18/09/2022T1MIDAMIDA-T1TOPCOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 6 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 6 m width surface.

HASAN GREENYURTJ395
3599T10-26
18/09/2022T2MIDAMIDA-T216/09/2022

The size of the damage, which is a topcoat surface defect, is 6.5 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 6.5 m width surface.

HASAN GREENYURTJ395
3598T10-25
18/09/2022T3MIDAMID-T3TOPCOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 6.5 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 6.5 m width surface.

HASAN GREENYURTJ395
3597T10-24
18/09/2022T4MIDAMIDA-T4TOPCOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 6.5 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 6.5 m width surface.

HASAN GREENYURTJ395
3596T10-23
18/09/2022T5MIDAMIDA-T5TOPCOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 7 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 7 m width surface.

HASAN GREENYURTJ395
3595T10-22
18/09/2022T6MIDAMIA-T6TOPCAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 7.5 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 7,5 m width surface.

HASAN GREENYURTJ395
3594T10-21
18/09/2022T7MIDAMIDA-T7TOPCAOT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 7.5 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 7.5 m width surface.

HASAN GREENYURTJ395
3593T10-20
18/09/2022T8MIDAMIDA-T8TOPCOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 8 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 8 m width surface.

HASAN GREENYURTJ395
3592T10-19
18/09/2022T9MIDAMIDA-T9TOPCOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 7 m wide during the whole ring length. At the end of the painting process, topcoat paintwork was done on a 7 m width surface.

HASAN GREENYURTJ395
3591T10-18
18/09/2022T1TOP SECTIONTOP-T1TOPCOAT DAMAGE16/09/2022

The size of the damage, which is a topcoat surface defect, is 1.5x2 m. At the end of the painting process, topcoat paintwork was done on a 1.7 x 2.2 m surface.

HASAN GREENYURTJ395
3590T10-17
18/09/2022T3BASE TOWERT10-17CORRODED SURFACE09/09/2022

The size of the damage, which is a corroded surface defect, is 7 x 15 cm. At the end of the painting process, topcoat paintwork was done on a 30 x 30 cm surface.

HASAN GREENYURTJ395
3589T10-16
18/09/2022T1MIDBT10-16CORRODED SURFACE09/09/2022

The size of the damages, which are corroded surface defects, is 3X3 and 3x3cm. At the end of the painting process, an intermediate coat of paint was done on the damaged surface. Local damages were repaired up to the second floor. The final coat of paint has also been applied to a larger area.

HASAN GREENYURTJ395
3588T10-12
18/09/2022T4MIDBT10-12CORRODED SURFACE09/09/2022

The size of the damage, which is a corroded surface defect, is 3 x 15 cm. At the end of the painting process, an intermediate coat of paint was done on a 5 x 20 cm surface. Local damages were repaired up to the second floor. The final coat of paint has also been applied to a larger area.

HASAN GREENYURTJ395
Entry IDService NoBefore Application PhotoDuring Application PhotoAfter Application PhotoReporting DateDamage SideApplication AreaDamage NoDamage TypeApplication DateDescriptionReporterWork Code

Job Report Consent

Please approve our work.

DD slash MM slash YYYY

APPROVALS

No entries match your request.

Shopping cart
Sign in

No account yet?

Start typing to see products you are looking for.
en_GBEnglish (UK)
Shop
0 Wishlist
0 items Cart
My account