FRM.004 Records
FRM.004 Entries
Company Name | Report Date | Select Technician | Location Name | Installation Start Date | Installation End Date | Device Model | Serial Number | Release Date of the Device from the Factory | Entry ID | Telephone Number | IP Number | Cabinet Configuration | Roof Condition | Additional Information | Notes (Contractor) | Notes (Location Technical Team) | Notes (PUDO) | Upload Report Photos | Reporting - Name / Surname 1 | Task 1 | Email 1 | History 1 | Signature 1 | Location Confirmation / Name / Surname 2 | Task 2 | Email 2 | History 2 | Signature 2 | PUDO Approval / Name / Surname 3 | Task 3 | Email 3 | History 3 | Signature 3 | Feedback about this form | Entry Date | User | User IP |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
07/04/2022 | R6 | 201 | 6+1 | Yavuz Orhan | Mustafa Furkan | Ahmet Erdoğan Şener | [email protected] | 07/04/2022 | 07/04/2022 02:40 PM | 212.252.118.185 | |||||||||||||||||||||||||||
07/04/2022 | R6 | 206 | 6+1 | G cabinet left front foot and nut missing D cabinet internal electrical devices missing |
Ergin Pekmezekmek | [email protected] | 07/04/2022 | Ergin Pekmezekmek | Ahmet Erdoğan Şener | [email protected] | 08/04/2022 01:52 PM | 46.196.104.230 | |||||||||||||||||||||||||
14/06/2022 | R1 | 1208 | 6+1 | The upper connection bolts are short, not enough for the side bases and roof connection. | Süleyman Ergül | 14/06/2022 | Süleyman Ergül | 14/06/2022 | Ahmet Erdoğan Şener | [email protected] | 14/06/2022 02:58 PM | 178.243.202.130 | |||||||||||||||||||||||||
15/06/2022 | R1 | 1573 | 6+1 | Süleyman Ergül | 15/06/2022 | Süleyman Ergül | 15/06/2022 | Ahmet Erdoğan Şener | [email protected] | 15/06/2022 03:03 PM | 178.243.202.130 | ||||||||||||||||||||||||||
17/06/2022 | R1 | 2560 | 6+1 | Unit A upper part does not fit in place. | Süleyman Ergül | 17/06/2022 | Süleyman Ergül | 17/06/2022 | Ahmet Erdoğan Şener | [email protected] | 17/06/2022 05:56 PM | 178.243.202.130 | |||||||||||||||||||||||||
01/06/2022 | R1 | 2996 | 6+1 | Süleyman Ergül | 01/06/2022 | Süleyman Ergül | 01/06/2022 | Ahmet Erdoğan Şener | [email protected] | 22/06/2022 10:57 AM | 85.103.108.230 | ||||||||||||||||||||||||||
R1 | 2997 | 6+1 | Süleyman Ergül | 01/06/2022 | Süleyman Ergül | 01/06/2022 | Ahmet Erdoğan Şener | [email protected] | 22/06/2022 11:00 AM | 85.103.108.230 | |||||||||||||||||||||||||||
03/06/2022 | R1 | 2998 | 6+1 | Süleyman Ergül | 03/06/2022 | Süleyman Ergül | 03/06/2022 | Ahmet Erdoğan Şener | [email protected] | 22/06/2022 11:02 AM | 85.103.108.230 | ||||||||||||||||||||||||||
02/06/2022 | R1 | 2999 | 6+1 | Süleyman Ergül | 02/06/2022 | Süleyman Ergül | 02/06/2022 | Ahmet Erdoğan Şener | [email protected] | 22/06/2022 11:04 AM | 85.103.108.230 | ||||||||||||||||||||||||||
02/06/2022 | R1 | 3000 | 6+1 | Süleyman Ergül | 02/06/2022 | Süleyman Ergül | 02/06/2022 | Ahmet Erdoğan Şener | [email protected] | 22/06/2022 11:06 AM | 85.103.108.230 | ||||||||||||||||||||||||||
Company Name | Report Date | Select Technician | Location Name | Installation Start Date | Installation End Date | Device Model | Serial Number | Release Date of the Device from the Factory | Entry ID | Telephone Number | IP Number | Cabinet Configuration | Roof Condition | Additional Information | Notes (Contractor) | Notes (Location Technical Team) | Notes (PUDO) | Upload Report Photos | Reporting - Name / Surname 1 | Task 1 | Email 1 | History 1 | Signature 1 | Location Confirmation / Name / Surname 2 | Task 2 | Email 2 | History 2 | Signature 2 | PUDO Approval / Name / Surname 3 | Task 3 | Email 3 | History 3 | Signature 3 | Feedback about this form | Entry Date | User | User IP |
Please choose input type for columns that you want to edit